English

首页 › 五金冲压·拉伸·数控车件

五金冲压·拉伸·数控车件

冲压件与机加工件按图生产,没有目录价。核心决策是模具成本:单工序模便宜但单价高,级进模贵但年量5万件以上时单价大幅下降。询价请提供 STEP/DXF 图纸,并写明公差、材料、厚度、表面处理与年用量,才能在不同产业带之间横向比价。

产业带

广东深圳/东莞——精密级进模冲压与数控车件;江苏昆山/苏州——钣金与自动化设备件;浙江余姚——小五金消费件

典型产品

Progressive-die stamped partsDeep-drawn shells & cansSheet-metal enclosures & bracketsCNC turned shafts/bushingsMilled aluminium housingsLaser-cut & welded assemblies

材质

SPCC / SPHC mild steelSUS301 / 304 / 316 stainlessSPCC galvanised sheetAluminium 5052 / 6061Brass / copper / phosphor bronze

表面工艺

Zinc / nickel / tin platingAnodising (clear / colour)Powder coatPassivationDacromet

报价会引用的标准

ISO 2768 general toleranceISO 9001 / IATF 16949 (automotive lines)PPAP Level 3 where claimedRoHS / REACH for EU export

规格参考表

参数项需要约定的内容
Press tonnage25 t to 300 t (progressive lines typically 60–200 t)
Min featureHole ≥ sheet thickness; bend radius from 0.5 t depending on grade
ToleranceISO 2768-m/f; precision dies hold ±0.02–0.05 mm
CNC turningØ0.5–Ø60 mm, Swiss-type for ≤ Ø12 mm long-thin parts
Tool lifeCr12MoV / SKD11 die steel, 300k–1M strokes before regrind
InspectionFirst-article report, CMM / optical measurement, salt spray per coating
CoatingIn-house plating for zinc/nickel; powder coat usually outsourced
常规起订量:Typically 500–1,000 pcs for laser/water-cut, 5k–20k for stamped parts, 500 pcs for CNC turning batches;常规交期:Prototype 7–12 days; single-hit tooling 20–30 days; progressive die 40–60 days。

本品类已收录工厂

本品类暂未发布工厂页。上方规格参考表可直接用于询价;工厂页后续会挂在本品类 URL 之下。

买家常见问题

Why do two Chinese factories quote my stamped part 40% apart?

Because the quotes usually cover different things: die steel grade and expected tool life, press tonnage and stroke rate, whether plating is in-house or outsourced, tolerance class actually held, and whether the quoted unit price amortises the die. Normalise the PO around these five items and the spread narrows.

What files should I send to get a stamping quote?

A 3D STEP plus a 2D DXF with critical dimensions toleranced, material grade and thickness, coating spec, hole/bend notes, and estimated monthly and annual volumes. Without annual volume a factory will quote a small-die solution and a high unit price.